Skip to content
← All packs

National fibre-optic network

Connect every town in a country with fibre, at least cost and with no weak point.

Project 18 pictogram

The challenge

Thousands of kilometres of cable, costs that depend on the terrain: a hand-drawn route is expensive.

What you will be able to do

Optimal route, protection rings, quantities and costs per section, phasing and tender schedules.

What’s inside

  • 8 hands-on videos of 10 to 20 minutes
  • Ready-to-use real data: Benin (national)
  • PyQGIS scripts commented line by line (in French)
  • Guide to redo each step with the mouse, without code
  • “Getting started with PyQGIS” module included